Tunnel Face Stabilization

Products to choose from

Consolidation of sandy soils

Consolidation of broken rock

Stabilisation of cohesionless soils and fragmented rock

Void and cavity filling

Download

Stabilization and waterproofing ahead of tunnel excavation

Tunnel face stabilization is an essential safety measure in tunnel and underground excavation. It stabilizes the excavation face ahead of advance and protects the area against water ingress – particularly in unstable ground conditions or water-bearing strata.

 

The method is used as a preparatory measure to ensure the stability of the excavation face and to enable controlled and safe tunneling. Without this measure, advancing in difficult ground conditions would often not be possible.

 

RASCOR offers tailored injection solutions for tunnel construction, specialist foundation engineering and infrastructure projects.

When is tunnel face stabilization used?
  • Unstable or loose ground conditions ahead of the excavation face
  • Water-bearing layers in the tunneling zone
  • Securing the excavation face prior to advance
  • Preparation for further stabilization and waterproofing measures
  • Tunneling in urban environments with increased safety requirements
  1. Injection: The material is introduced into boreholes ahead of the excavation face.
  2. Penetration: Depending on the system, it penetrates pores, fissures and voids in the ground.
  3. Stabilization: The binder bonds soil particles and increases shear strength.
  4. Waterproofing: At the same time, the permeability of the ground is reduced.
  • Acrylate gels (AY408, AY808) – for large-area waterproofing and soil consolidation in fine-grained, permeable ground
  • Polyurethane resins (PU309L, PU309N, PU309S, PU309F) – for flexible stabilization and waterproofing in conventional tunneling
  • Urea-silicate systems (US409, US509F) – for rapid reaction, high strength and good workability
  • Hybrid systems (HMS317) – for cost-efficient and versatile stabilization solutions

Tunnel face stabilization secures the excavation face ahead of tunneling through injection into the ground in front of the face – it is a temporary, ground-focused measure. Curtain injection, by contrast, creates a permanent, large-area waterproofing barrier between an existing structure and the surrounding soil. Despite using similar injection techniques, the objectives, application areas and effects differ fundamentally.

  • tunnel and gallery excavation
  • shaft construction and geotechnical works
  • securing the tunnel face in difficult ground conditions
  • stabilization and waterproofing ahead of excavation
  • Consulting and support

    RASCOR has been developing and delivering specialized injection and stabilization solutions for infrastructure and construction projects worldwide for decades. Our systems are used by construction companies, infrastructure operators and engineers who require reliable, long-lasting waterproofing solutions.

     

    We support you in selecting the right system – tailored to your application, requirements and project conditions.

    .