Stabilization of ballast and gravel structures through targeted bonding

Ballast bonding is used to stabilize ballast and gravel layers by targeted bonding and to sustainably improve load-bearing capacity. It is primarily applied in railway construction as well as in infrastructure and construction projects where loose aggregates need to be secured.


Through bonding, an artificial cohesion is created between individual aggregate particles. This improves load distribution, increases structural stability and reduces movement within the ballast layer. At the same time, the system remains water-permeable.


In contrast to ground consolidation, the effect is achieved near the surface through bonding of individual particles – not through injection into the subsoil. This allows for rapid application, even during ongoing railway operations.

When is ballast bonding used?

Ballast bonding is the right solution when ballast areas need to be stabilized under load – without extensive structural interventions or track closures:

  • Stabilization of railway ballast under operational traffic
  • Securing ballast slopes and excavation edges
  • Construction works in track areas during ongoing operations
  • Reduction of ballast movement and loss due to vibration
  • Temporary and permanent stabilization during construction phases

The process consists of three steps:

  1. Application: The polyurethane binder RASCOrail RBP320 is applied to the ballast surface using a spray method.
  2. Reaction: The binder penetrates voids and bonds the aggregate particles at their contact points.
  3. Curing: A stable, load-bearing structure is formed while maintaining long-term water permeability.

The result is a dimensionally stable ballast structure that withstands loads without compromising drainage performance.

For ballast bonding, RASCOR relies on proven polyurethane systems:

  • RASCOrail RBP320 – polyurethane system for spray applications, combining high stability with permanent water permeability. Suitable for railway ballast and gravel layers.

Material selection depends on ballast type, load conditions, environmental factors and durability requirements.

  • Fast application without track closures
  • Long-term stabilization while maintaining water permeability
  • Suitable for use during ongoing railway operations
  • Cost-effective alternative to structural interventions
  • Suitable for both temporary and permanent applications

Both methods are part of injection and stabilization technologies but differ fundamentally in their mechanism and application:

FeatureBallast BondingGround Consolidation
Depth of effectNear-surfaceDeep within the subsoil
Main applicationRailway ballast, gravel layersFoundations, load-bearing soils
MethodSpray applicationInjection into subsoil
Water permeabilityMaintainedReduced
  • Railway construction and rail infrastructure 
  • Ballast slopes and excavation stabilisation
  • Transport and infrastructure structures
  • Temporary stabilisation during construction works
  • Permanent securing of loose aggregates

Consulting and support

RASCOR has been developing and delivering specialized injection and stabilization solutions for infrastructure and construction projects worldwide for decades. Our systems are used by construction companies, infrastructure operators and engineers who require reliable, long-lasting waterproofing solutions.

 